CVS is currently in the process of redesigning their stores and the perfect focal point to any project is a Superior Faux Wood Truss System. In addition to the truss, over 116 custom rafter tails/corbels were used in this project. Along the outer perimeter, a custom decorative wood grain trim was installed where most of the custom rafter tails were installed.
Superior Building Supplies supplied worked closely with the architect and onsite installation team to make sure that everything was made to the correct requirements. Once the architectural team approved the shop drawings of the installation, production started right away. Less than 4-1/2 weeks later the very precise truss shipped out and was installed shortly after.
No matter your requirments the Superior Building Supplies design team can turn your dreams, drawings and sketches into creations.